Project · Dorking · Large-scale project

SWR's Premium Installation at The Boat House

A premium riverside balustrade, eight years in the making

Location

Dorking

Sector

Residential

System

Glass Channel & Modular

Duration

xx weeks

Scope

Project Management, Supply & Install

The brief

Working to deliver sophistication and safety.

A premium riverside balustrade that elevates the property while keeping every visitor safe.

The Boat House installation is definitely worth checking out. It showcases a balustrade design that not only adds a touch of sophistication but also prioritises visitor safety. The planning phase for this project spanned a period of eight years, with SWR providing a comprehensive project management service throughout.

This encompassed detailed site surveys, full specifications, and the supply and installation of various components. The balustrade itself spanned an impressive 110 metres, comprising 30 metres of Glass Channel Balustrade and 80 metres of Modular Balustrade.

A total of 3.5 tonnes of glass were meticulously fitted to create this remarkable structure. To maintain a sleek and tidy appearance, the Channel track was cleverly concealed within the decking structure, delivering a clean architectural finish across the full length of the run.

— BOATHOUSE & RIVERSIDE TERRACE.
— GLASS CHANNEL BALUSTRADE, DETAIL.
— MODULAR BALUSTRADE, WALKWAY.
Specification

The full specification.

110 metres of glass and modular balustrade across a premium riverside residence.

System

Glass Channel & Modular Balustrade

System type

Frameless glass channel & modular tube

Application

Riverside decking & terrace

Building type

Private residence

Infill

Glass

Quantity

30m Glass Channel, 80m
Modular, 3.5 tonnes glass

Compliance

TBC

SWR scope

Project management,
supply & install

Lead time

TBC

Warranty

TBC

System

Glass Channel & Modular Balustrade

System type

Frameless glass channel & modular tube

System

Stainless Steel Balustrade

Application

Riverside decking & terrace

Building type

Private residence

Infill

Glass

Quantity

30m Glass Channel, 80m Modular, 3.5 tonnes glass

Compliance

TBC

SWR scope

Project management, supply & install

Lead time

TBC

Warranty

TBC

The process

Delivering a premium riverside balustrade, end to end.

SWR Process Block
— 01

Brief

Stage 1

SWR engaged to supply and install a premium balustrade to enhance both safety and the property's riverside aesthetic.

— 02

Survey

Stage 2

Detailed site surveys carried out to measure and plan the installation precisely across the riverside terrace and decking.

— 03

Fabrication

Stage 3

Glass Channel and Modular components prepared, including 3.5 tonnes of glass fabricated for the 110-metre run.

— 04

Installation

Stage 4

110 metres fitted, with the Channel track cleverly concealed within the decking structure for a clean finish.

— 05

Completion

Stage 5

A sleek, tidy balustrade delivered to the client's full satisfaction, leading to further projects on the property.

— 01

Brief

Stage 1

SWR engaged to supply and install a premium balustrade to enhance both safety and the property's riverside aesthetic.

— 02

Survey

Stage 2

Detailed site surveys carried out to measure and plan the installation precisely across the riverside terrace and decking.

— 03

Fabrication

Stage 3

Glass Channel and Modular components prepared, including 3.5 tonnes of glass fabricated for the 110-metre run.

— 04

Installation

Stage 4

110 metres fitted, with the Channel track cleverly concealed within the decking structure for a clean finish.

— 05

Completion

Stage 5

A sleek, tidy balustrade delivered to the client's full satisfaction, leading to further projects on the property.

Not only does the balustrade add a touch of sophistication, it also prioritises the safety of everyone who visits the property.

From the original

The Boat House, Dorking

The result

110 metres. Beautifully concealed.

SWR delivered 110 metres of balustrade across this premium riverside residence, comprising 30 metres of Glass Channel and 80 metres of Modular Balustrade. The result is a balustrade that not only meets the highest safety standards but provides a considered, lasting finish in keeping with the property’s setting.

For SWR, the Boat House represents a showcase of precision and craft, with 3.5 tonnes of glass meticulously fitted and the Channel track cleverly concealed within the decking for a clean, architectural finish.

100m

Balustrade

3.5t

GLASS FITTED

2

Systems
More projects

More glass installs.

Dorking
Glass Channel & Modular Balustrade

Glass Balustrade Case Study, Grade II Listed Home in Essex

A premium riverside balustrade that elevates the property while keeping every visitor safe.
Dorking
Glass Channel & Modular Balustrade

SWR’s Premium Installation at The Boat House​

A premium riverside balustrade that elevates the property while keeping every visitor safe.
Cambridge
Stainless Steel Balustrade

SWR’s Milestone Installation at Addenbrookes Hospital, Cambridge

Half a kilometre of stainless steel balustrade installed across the external walkways of one of the UK’s busiest hospital sites.